🇸🇪
Network Operator
Heavy Duty OKQ8 SE
Reliability analysis and infrastructure distribution for Heavy Duty OKQ8 SE.
Real-time reliability analytics for Heavy Duty OKQ8 SE’s EV charging network. Monitoring 35 stations and 91 connectors — live reliability index, availability, utilization rate and 60-day performance history to evaluate network quality across Sweden.
Realtime reliability and benchmarking metrics for all 35 stations
Full network drill-down & independent diagnostics report
35
Stations
Current
91
EVSEs
Current
93.0
Symbioen Index
Last 7 days
98.2%
Availability
Last 7 days
7.0%
Utilization Rate
Last 7 days
71.4%
Performance
Last 7 days
History
Last 60 days
Not enough data for this period
Network Stations
Detailed overview of active infrastructure managed by Heavy Duty OKQ8 SE.
OKQ8
🇸🇪 Jönköping
2 Connectors
OKQ8
🇸🇪 Kalmar
4 Connectors
OKQ8
🇸🇪 Norrköping
2 Connectors
OKQ8
🇸🇪 Värnamo
2 Connectors
*OKQ8 Truck GLUMSLÖV E6 NORRGÅENDE 1 300052
🇸🇪 Glumslöv
4 Connectors
OKQ8
🇸🇪 Torsby
2 Connectors
OKQ8
🇸🇪 Västerås
2 Connectors
OKQ8
🇸🇪 Hisings Backa
4 Connectors
OKQ8
🇸🇪 Söderhamn
4 Connectors
OKQ8
🇸🇪 Ödeshög
2 Connectors
OKQ8
🇸🇪 Umeå
2 Connectors
OKQ8
🇸🇪 Tvååker
3 Connectors
OKQ8
🇸🇪 Linköping
2 Connectors
OKQ8
🇸🇪 Lidköping
2 Connectors
OKQ8
🇸🇪 Sollentuna
2 Connectors
OKQ8
🇸🇪 Malmö
2 Connectors
OKQ8
🇸🇪 Halmstad
2 Connectors
OKQ8
🇸🇪 Norrtälje
2 Connectors
OKQ8
🇸🇪 Mora
2 Connectors
OKQ8
🇸🇪 Skövde
4 Connectors
OKQ8
🇸🇪 Båstad
4 Connectors
OKQ8
🇸🇪 Vänersborg
2 Connectors
OKQ8
🇸🇪 Jordbro
4 Connectors
OKQ8
🇸🇪 Örnsköldsvik
2 Connectors
OKQ8
🇸🇪 Gällö
4 Connectors
OKQ8
🇸🇪 Skellefteå
2 Connectors
OKQ8
🇸🇪 Växjö
2 Connectors
OKQ8
🇸🇪 Luleå
2 Connectors
OKQ8
🇸🇪 Skellefteå
2 Connectors
OKQ8
🇸🇪 Borlänge
2 Connectors
OKQ8
🇸🇪 Örebro
2 Connectors
OKQ8
🇸🇪 Borås
2 Connectors
OKQ8
🇸🇪 Brålanda
4 Connectors
*OKQ8 Truck Arlandastad Voltgatan 11, 1 282948
🇸🇪 Arlandastad
4 Connectors
OKQ8
🇸🇪 Uppsala
2 Connectors