Lindegården Plejecenter
Lindegårdsvej 3 7400 HERNING, Midtjylland, DK
Operator: EWII
Owner: Herning Kommune
Real-time reliability analytics for the EWII EV charging station at Lindegårdsvej 3 7400 HERNING, Midtjylland, DK, owned by Herning Kommune. Monitor live availability, utilization rate and the Symbioen Index across 6 connectors — with 60-day performance history to evaluate charging infrastructure quality.
For site hosts, operators and asset managers
Keep this station under independent review
Add it to your portfolio for weekly Symbioen Index, Availability and Utilization trends, or scope a report that turns comparable evidence into an SLA, maintenance or asset decision.
68.1
Symbioen Index
Last 7 days
6
Connectors
Current
100%
Coverage
Current
--
Availability
Last 7 days
--
Utilization Rate
Last 7 days
History
Last 60 days
Loading...
Audit Logs
EligibilityPassed
IncompletenessNone
Audit Points218 tracked
Reliability is scored under Symbioen Reliability Protocol v0.5 and updated continuously from live telemetry.
Connector Fleet
EVSE 1052
AVAILABLE
Symbioen Index74
UID: 3061052
Power
22kW
Type
Type 2
EVSE 1053
AVAILABLE
Symbioen Index74
UID: 3061053
Power
22kW
Type
Type 2
EVSE 1054
AVAILABLE
Symbioen Index74
UID: 3061054
Power
22kW
Type
Type 2
EVSE 1055
AVAILABLE
Symbioen Index49
UID: 3061055
Power
22kW
Type
Type 2
EVSE 1057
AVAILABLE
Symbioen Index64
UID: 3061057
Power
22kW
Type
Type 2
EVSE 1058
AVAILABLE
Symbioen Index74
UID: 3061058
Power
22kW
Type
Type 2