Markedspladsen

Markedspladsen 3 7400 HERNING, Midtjylland, DK
Operator: EWII
Owner: Herning Kommune

Real-time reliability analytics for the EWII EV charging station at Markedspladsen 3 7400 HERNING, Midtjylland, DK, owned by Herning Kommune. Monitor live availability, utilization rate and the Symbioen Index across 10 connectors — with 60-day performance history to evaluate charging infrastructure quality.

For site hosts, operators and asset managers

Keep this station under independent review

Add it to your portfolio for weekly Symbioen Index, Availability and Utilization trends, or scope a report that turns comparable evidence into an SLA, maintenance or asset decision.

72.8
Symbioen Index
Last 7 days
10
Connectors
Current
100%
Coverage
Current
--
Availability
Last 7 days
--
Utilization Rate
Last 7 days

History

Last 60 days
Loading...

Audit Logs

EligibilityPassed
IncompletenessNone
Audit Points592 tracked

Reliability is scored under Symbioen Reliability Protocol v0.5 and updated continuously from live telemetry.

Connector Fleet

EVSE 3935
AVAILABLE
Symbioen Index72
UID: 3013935
Power
250kW
Type
CCS/Combo
EVSE 3937
AVAILABLE
Symbioen Index71
UID: 3013937
Power
250kW
Type
CCS/Combo
EVSE 4913
AVAILABLE
Symbioen Index74
UID: 3024913
Power
22kW
Type
Type 2
EVSE 4918
CHARGING
Symbioen Index71
UID: 3024918
Power
22kW
Type
Type 2
EVSE 4920
AVAILABLE
Symbioen Index74
UID: 3024920
Power
22kW
Type
Type 2
EVSE 4923
AVAILABLE
Symbioen Index74
UID: 3024923
Power
22kW
Type
Type 2
EVSE 4929
AVAILABLE
Symbioen Index74
UID: 3024929
Power
22kW
Type
Type 2
EVSE 4930
AVAILABLE
Symbioen Index74
UID: 3024930
Power
22kW
Type
Type 2
EVSE 1806
AVAILABLE
Symbioen Index71
UID: 3521806
Power
250kW
Type
CCS/Combo
EVSE 1830
AVAILABLE
Symbioen Index74
UID: 3521830
Power
250kW
Type
CCS/Combo